Building Permits

In order to receive a building permit, approval must first be given by the Zoning Administrator.  Such approval will require a site sketch of a site plan.

The following applications require building permits:

  • All plumbing that ties into City taps now requires a permit and  must be inspected prior to covering any lines.
  • Anything you construct or alter to a structure (New home, garage, accessory building or remodeling)
  • Electrical, plumbing, or mechanical (HVAC)
  • Commercial signage
  • Pools or tanks
  • Industrial or commercial remodeling or construction
  • Vinyl siding, replacement windows, or remodeling in excess of 50% of property value
  • Demolish a structure

NOT REQUIRING PERMITS:

  • Painting, plastering, wall-papering
  • Electrical less than 50 volts
  • Storage building under 150 square feet
  • Replacement of  roof covering, carpet, cabinets, or floor coverings. 
  • Any replacement of mechanical or plumbing equipment and appliances except those fueled by gas or oil, within a dwelling unit in occupancies of use group R-2, which are 4 stories or less in height and in occupancies of use Use Groups R-3 and R-4.